All silicon bought now, just one alu pipe left to cut and swage.

Oil feed parts constructed into the finished hose yesterday.

To Do:
weld back on IC inlet/outlet
Drill turbo mount flange to accept larger studs on the adapter.
Have wastegate bracket laser cut and folded.
Make downpipe & decat pipe.
To buy:
Hose clips.
Lambda boss.
Dump valve.
Downpipe flange.
Injectors.
Clutch.

Oil feed parts constructed into the finished hose yesterday.

To Do:
weld back on IC inlet/outlet
Drill turbo mount flange to accept larger studs on the adapter.
Have wastegate bracket laser cut and folded.
Make downpipe & decat pipe.
To buy:
Hose clips.
Lambda boss.
Dump valve.
Downpipe flange.
Injectors.
Clutch.
Comment