Still been really busy working on the shop but I finally got around to taking some pictures of the place last week and I'm just now uploading them.
Here is the building itself. It's about a 20 year old metal building that was being used as a warehouse.
building (1 of 1) by dillonmakar, on Flickr
It's divided into two sections. The front section was refinished a couple years ago and is smaller than the back section. It has an office area that wasn't quite complete so this past week I have been doing all of the dry wall work on it. On top of the office used to be a storage room but we tore it down and built a railing around the top so we could store parts and stuff up there.
Office (1 of 1) by dillonmakar, on Flickr
inside office (1 of 1) by dillonmakar, on Flickr
front room (1 of 1) by dillonmakar, on Flickr
Here is the back room. It was never really finished so this week all the metal paneling is going up. A lot of the insulation was damaged so I've spent the last two weeks fixing that when I have a little free time.
back room (1 of 1) by dillonmakar, on Flickr
Around the side has a nice covered area that I have been using to park all the e30s. I have three that I am parting and and one that I fixed and am selling. It's in the process of being paved right now and will hopefully be finished by the end of the week depending on the weather.
paving (1 of 1) by dillonmakar, on Flickr
All in all everything is going great. I haven't worked on cars much but I have learned a lot about construction which is always good to know. I have my first customer job this week doing a 5 speed swap which is pretty exciting to finally get the ball rolling.
In case you don't want to see pics of the shop here is a pic of the bmw to keep your interest.
BMW on the driveway (1 of 1) by Dillon Makar, on Flickr
Here is the building itself. It's about a 20 year old metal building that was being used as a warehouse.

It's divided into two sections. The front section was refinished a couple years ago and is smaller than the back section. It has an office area that wasn't quite complete so this past week I have been doing all of the dry wall work on it. On top of the office used to be a storage room but we tore it down and built a railing around the top so we could store parts and stuff up there.



Here is the back room. It was never really finished so this week all the metal paneling is going up. A lot of the insulation was damaged so I've spent the last two weeks fixing that when I have a little free time.

Around the side has a nice covered area that I have been using to park all the e30s. I have three that I am parting and and one that I fixed and am selling. It's in the process of being paved right now and will hopefully be finished by the end of the week depending on the weather.

All in all everything is going great. I haven't worked on cars much but I have learned a lot about construction which is always good to know. I have my first customer job this week doing a 5 speed swap which is pretty exciting to finally get the ball rolling.
In case you don't want to see pics of the shop here is a pic of the bmw to keep your interest.

Comment