Well everything works, compressor kicks on and the valves open and close. now I just need to get a switch box and wire/plumb it and then I'll be sitting pretty
this has me thinking twice about air now. im basically this low on coils. fml i want to lay frame
Well from what I've been told it won't lay fully But with the wheel/tire setup I want to run someday and the girlfriend constantly bitching about tires rubbing I thought I would just go air. Especially for the price I got everything for, I couldn't even buy a basic coilover kit for it lol
Well from what I've been told it won't lay fully But with the wheel/tire setup I want to run someday and the girlfriend constantly bitching about tires rubbing I thought I would just go air. Especially for the price I got everything for, I couldn't even buy a basic coilover kit for it lol
yeah for a good price you cant beat it. but i already bought coils and have the ability to go a little lower. i just wanted air to lay frame. i might get it anyways and figure out a way. nothing a welder and some metal cant fix lol the pinch welds up front if you remove should add a little bit of room to play
yeah for a good price you cant beat it. but i already bought coils and have the ability to go a little lower. i just wanted air to lay frame. i might get it anyways and figure out a way. nothing a welder and some metal cant fix lol the pinch welds up front if you remove should add a little bit of room to play
I always hammer mine flat. Was thinking maybe the upper control arm is holding it up in the front but I won't see till we get it in. Rear we can get to get close to laying but I think the tire will hold it up. Either way we will see. I have a 10 switch box coming in and a 150psi pressure switch so we hopefully will be hitting switches in a week or so.
Comment