Announcement

Collapse
No announcement yet.

Eurowise Project 500hp turbo awd 1984 rabbit GTI

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • eurowise
    replied
    Custom fuel pump pickup\hat\sender setup almost complete

    OEM r32 sender integrated









    The hat assembly using -8 fuel feed and -6 fuel return fittings.

    Leave a comment:


  • dc5erm
    replied
    holy shit!

    Leave a comment:


  • DubLuv
    replied
    awesome build, can't wait for more updates

    Leave a comment:


  • Neoki
    replied
    i think this guy had a weld fetish...


    wonderfull job

    Leave a comment:


  • Joshbm
    replied
    this is epic, sub'd

    Leave a comment:


  • sirdriftalot
    replied
    I have a special place in my heart for MK1's...... I'm glad to see you are taking every detail into mind

    Leave a comment:


  • blowntwofive
    replied
    wow

    Leave a comment:


  • PMcD
    replied
    Glad to see some updates on this!

    Leave a comment:


  • softg
    replied
    subscribed. this is brilliant

    Leave a comment:


  • Doicus'smighty
    replied
    thats fucking crazy, wish i had the knowledge to do something like that

    Leave a comment:


  • Chigga
    replied
    That's the prettiest dip stick I've ever seen!

    Leave a comment:


  • eurowise
    replied
    Updates!

    original thread here




    Fuel system was next on the list to be worked on. We’ve had the build on hold to finish up our MK1 VR6 motor mount kit, and several other big turbo fabrication builds.



    In the mean time we’ve also been working on billet dipstick replacements.



    Lifetime warranty stainless and 6061 contruction!



    Since rear floor is raised and with the AWD suspension and drivetrain taking up lots of space. We had to be creative and utilize as much free space as possible for the tank. This involves building a gas tank from scratch.

    Tire hump was first cut out



    Plenty of useable gas space



    Sheet metal will be fabricated and welded back in place



    With the available open drop section in the rear we’ll box in an area to utilize even more gas tank space.





    After built it will also be reinforced and welded in place.



    Here is the finished product





    We’ll then built a gas tank from stainless steel and it will sit perfectly in the floor once finished



    Detail shots






    Edges notched out



    New made floor slipped in place







    The fuel system will consist of twin walbro 255 intank pumps with -8 fuel lines throughout.

    We’ll use an OEM R32 fuel pump assembly to utilize the factory fuel level sender so the oem gauge works properly. In order to make it work with an all stainless fuel tank we machined custom fuel pump hats.



    The lid will have all the all an bungs and fittings welded to it with functional oem connectors as well for power and sender

    Leave a comment:


  • HooWybrow
    replied
    Originally posted by grannyek View Post
    will the snails get any kind of fresh air plumbing for those filters?

    Just imagining the temps near the firewall when that things screaming
    Thats the beauty of the intercooler


    and this thing is fucking nuts!

    Leave a comment:


  • grannyek
    replied
    will the snails get any kind of fresh air plumbing for those filters?

    Just imagining the temps near the firewall when that things screaming

    Leave a comment:


  • tgrinsell
    replied
    sick car, you shoulda kept the square headlights tho

    Leave a comment:

Working...
X