If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
pshhhh you should be able to build 3 cars in that time
I agree. I estimate the entire air install should take a leisurely weekend to do. but I dont have wheels, air tank, mounting brackets for the air or my bags and brackets yet. a lot of the parts im waiting on are still in the manufacturing process. so im a few weeks away to even having all my parts lol
it should only take a day of steady working... the 2 biggest problems I have are finding a safe and accessable place to run the air lines, and finding and IGN. hot wire... haha usually 6 hour for a complete install.
it should only take a day of steady working... the 2 biggest problems I have are finding a safe and accessable place to run the air lines, and finding and IGN. hot wire... haha usually 6 hour for a complete install.
all that stuf is pretty easy. I just slack when it comes to my own car. do some work, bs with people. i have horrible ADD
Comment