Announcement
Collapse
No announcement yet.
Bagged Blue-O-Two
Collapse
X
-
This is coming along very nicely! I'm so jealous that your body work and paint is already done.
-
Just another reason I want to eventually build a 2002, absolutely love it!
Leave a comment:
-
I will definitely be following this. Not sure how I missed this until now. Looking forward to the end result.
Leave a comment:
-
Has been working in the garage all the time. I'm just too lazy to tell what's going on...
Well, at least some pictures.
Minor weldings






Same process to the both sides. (new sills, subframe mounts etc.)

Modified E36 diff cover, to fit E30 diff. (LSD of course)

02-series rear subframe bushing cover, modified for shortened E30 bushing.


Struts

Original pedal box raised up to life (welded, sandblasted, painted and re-assembled)

For cruising. (hidden installation)

02 rear axle with E21 driveshafts and trailing arms, 20mm sway bar. Powerflex/Superflex bushings. (subframe modified to E30 diff)

Zimmermann brake discs and some other parts.

Front axle. 22mm sway bar. Powerflex/Superflex bushings...

..and Volvo 4-pot calipers.

To be continued...
Leave a comment:
-
Originally posted by Dr.AK View PostThis looks very promising!
Needs to be done quickly, if I'm going to be 12-14.7.13 in Obermehler.
Leave a comment:
-
Something new..
Modified E21 323i rear trailing arms


Fabbed some short shifter

Camber/toe kit welded on

Bought some steering wheel hub. Genuine NOS part from 70-80īs (last one in Finland)

----
I have E28 535 gearbox, so there is no place for speedo cable.
I am going to use E30 LSD differential, and there is a trigger and sensor for electric speedo.
So, the solution already exists---> Letīs fit E30 electric speedo to the 02 instrument cluster

Prototype of matching speedo dial face, clock replaced by a original tachometer

----
Fitting of E30 diff
Turned some adapter flange. Fits directly to the pinion flange

Bolt on

Extension..

..cutted to the proper length

Jigged to the subframe

Remove the lump


Remove original brackets, and bolt the new lump to the jig

E21 falf shafts fits perfectly

Finally, manufacturing new bracket points around the lump (Still under construction, because i am waiting some parts from the lasercutting company)
Thats how it goes here..
Leave a comment:

Leave a comment: