Originally posted by CrackerTeg
View Post
UPDATE
So its been a few weeks and I've really been trying to finish this thing up! Still a ways to go but i'm so close!
First things first, I took apart the front brake/hub/spindle assembly and packaged it up!

Somewhere in between test fitting and installing the new setup...

And finished!

Finally got my 90 degree silicone elbow mounted up to my throttle body so I could start making the intake..

After that I put my vette rollers on and proceeded to push it over to where the hoist was in the other bay.. this is where I totally fell inlove all over again and stopped and had a mini photoshoot in the late afternoon!
I'll let the photos goo for a bit....



Oh yeah, Got the exhaust all fitted finally and tacked up...






Wasn't happy with my upper radiator hose after the second version so I took it apart again. I had cut these two pieces of pipe you can see in the center section and had a friend weld it up! came out great. Its not exactly how I wanted it but im happy enough to leave it for the summer!



Then came the mess where my fabbed up and painted rad cover interfered with my intake elbow. So I started trimming.

Still had more to go! So I trimmed it more and fitted it again and again. Finally I was happy with this.


Had some spare pieces of aluminum laying around and didn't want to just leave the rad cover cut without a nice finished rolled edge on it. So I trimmed up two pieces to add to the rad support cover. Had them welded after fitting them!


After that I figured out where I wanted the exhaust tips to sit behind my roll pan. My father and I put the box back on, trimmed the exhaust tips and after that I pulled the exhaust off that hadn't been fully welded and had it welded up!


Got the exhaust back the next morning and put it back on! the exhaust was a huge final part of the build, getting it to work was very difficult but it worked out great! Welded up and looking great!


Got my rad cover back aswell, one of the guys at work primed it for me which was awesome. Sanded it that night and painted it textured satin black.

Looked pretty good when it was all done.


after that we checked everything underneath on the hoist, mounted up the tranny cooler (forgot to take pictures of that however I will). Loaded up the diff, transfer case, trans and engine with fluids and finished some final things off.
My father and I loaded up the Sy on the trailer to take it to a friend of my fathers. It will remain there for a few weeks so that he can help me out with the wiring. Longstory short when I get it back it should be firing over




That's all for now guys!









Leave a comment: